Monday, 28 January 2019

Cottage Revamp Two: Update 3


Still finding time in my odd moments to get some modelling on the second converted old cottage. (Managed to catch a nasty bug from Mrs Daxio, so not been up to much, twice in a month is not good :-(


Have raised some of the blocks for effect.


 Most of the basic timbers are now in but there are going to be some more added, I can feel it.



 These longer blank walls need cross timbers adding: from floor level to half way up next timber.


As you can see the roof is not complete although I have done an experimental row. Also the gap between the roof and the main structure is giving me some grief. May well be that I create a slight lip to seat and cover the join.




No comments:

Post a Comment